Revision history of "File:NMI timing diagram.png"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 19:35, 8 March 2015WikiSysop (talk | contribs). . (254 bytes) (+254). . (Diagram of worst case timings of interrupt service routines for quad density floppy disc access. According to Sonninen et al. in "64doc", to interrupt the next instruction the NMI must arrive before the last cycle of the current instruction. Thus, in the)